Construction
Order Description
Please allocate completion of 1 page for each attached file. If additional pages is needed for any of them, just inform me ASAP.
For the rest of the 5 pages, allocate one page for each item:
A. Research Task on Colorbond – Create a list from the relevant Australian Standard and clauses from the BCA that apply to a Colorbond wall cladding system.Visit the manufacturers website and detail a list of the installation methods recommended.Use illustrations photograph and sketches.Reference your work.
B. Roof framing assignment – The AS 1684.2 Timber Framing Construction is needed for this assignment – Write a description of and sketch three styles of roofs i.e. gable, hip etc. – What is the timber member that supports ceiling joists from above when their span exceeds their allowance? – Describe what a strut is and its purpose – Sketch a cross section of a truss roof including cladding and label all parts – Sketch a cross section of a pitched roof including cladding and label all parts – indicate with arrows from ridge to footing the downward force through each member of the truss and the pitched roofState the benefits from a construction point of view of a truss roof – State the benefits from a construction point of view of a pitched roof ( one built on site) – What section of the Australian Standards provides details for: – roof tiling (fixing and flashing) – metal roof sheeting (fixing and flashing)
C. Assignment – Project costs task – From a project managers point of view: Identify in generic terms the way in which the following would affect the cost of the build. 1. North point 2. slope of the site 3. surface drainage 4. removal of vegetation 5. large vehicle access into the site 6. material storage 7. waste removal
D. Footings Research Task – Describe what they are and explain the difference between the following types of footings:Use the AS 2870 and the relevant parts of the BCA to support your explanation, reference all of the relevant clauses in your description.Include a freehand sketch for each of the 3 types with notes identifying all of the components.Do not cut and paste illustrations from the Australian Standard or BCA. 1. Stiffened raft slab 2. Waffle pod 3. Strip footing 4. State the benefits or the negatives of increasing the depth and/or width of a continuous footing. 5. List the different soil classifications. 6. Explain the impact this classification has on the selection of a footing system?
E.Assignment – Regulations and Requirements Research Task – Task 1In a word document complete the following research on the requirements needed to either demolish or construct a type 1 or 10 building in your council area: 1. Name of your municipality (local council) 2. Name of planning scheme which building plans need to satisfy 3. Name of the zone in which your block is located i.e. your current house that you live in (accessed from the development plan) 4. Name (including year) of building act and regulations that deal with demolition in your state / territory 5. Workplace health and safety compliance requirements that need to be undertaken think about workers and the public: 6. Before during and after demolition or construction name two environmental protections measures that are undertaken to prevent or mitigate any adverse impact on the air, noise, soil, water, sewage pollution. 7. Who should be notified of the possibility of a breech or damage to the environment? 8. State all of the utility service providers who should be contacted prior to the commencement of demolition or construction work 9. the reasons why contacting the utilities important?
This question first appeared on Write My Essay

